Friday, 30 August 2024
packing
Getting ready for an Organ Recital. Checking all the batteries and cards on the cameras. I make sure I have packed all the necessary gear and not left anything out ready to do a live broadcast - ATEMs, Long SDI cables, tripods, and laptop.
Thursday, 29 August 2024
Sorting out wires
This is a job we have meant to do for a long time. As technology has changed, new systems have been installed behind our TV. Much is redundant, so we are now sitting behind the TV, rationalising all the wiring and getting rid of 90% of it.
Wednesday, 28 August 2024
Organ Concert Prep
My son is setting up all the Text lines at the bottom of the screen for when we do a live broadcast of an organ concert at the weekend. This organ has very little space around it, so it is a challenge to get all the angles right.
Tuesday, 27 August 2024
Still downloading
I spend so much time downloading photographs and videos to the computer for editing. Each camera needs a different way of downloading, so it is never simple to do just one method but a whole range.
Monday, 26 August 2024
Taking a break
I took a break from making films and taking photographs and instead went on the water in the Camera Boat, taking video and pictures of dinghy racing in strong and gusty winds. Not so much of a break, but a bit of fun.
Subscribe to:
Posts (Atom)
